Skip to main content
Movers unloading a crated Gen II MBE system outside CREOL
Gen II MBE chamber freshly installed in the growth bay
Two Gen II MBE chambers installed, with the nitride system behind

Unloading the MBE systems and moving them in!

One MBE system installed!

And the other system installed next door, with the nitride system in the corner (and the new buffer module making an appearance).